banner
Products
We have an array of superb quality products and services to meet your every need.
High Strength Film Reinforcement Wet

High Strength Film Reinforcement Wet

Overview The product (Class H) is constructed by wet-applied method and bonded to the base with cement paste or cement m;
Overview
Basic Info.
Ceiling Tile Type Width: 1m
Surface Treatment Reinforced
Function Waterproof
Certification ISO
Color Black
Usage Mall, Roofing and All Kinds of Underground Project
Transport Package Inner Tube +PP Woven Plastic Bag
Trademark OTAi, OEM
Origin Tianjin, China
Production Capacity 15 Million Square Meters
Product Description

The product (Class H) is constructed by wet-applied method and bonded to the base with cement paste or cement mortar. The product adds unique activator and soaking agent to the self-adhesive. On the basis of maintaining the advantages of the traditional self-adhesive rubber, the creep property of the resin is increased, and it penetrates into the pore and capillary of concrete to form physical adsorption and mortise and tenon. At the same time, concrete and cement gel react with each other to form a chemical cross-linking structure, so that the coil is firmly bonded with the base layer, forming a sealed and sealed waterproof layer.

Thickness1.5mm / 2.0mm
Length15m / 20m
Width1m
CertificateISO9001/14001/45001
Physical Property

High Strength Film Reinforcement Wet-Applied Waterproof Membrane

Applicable Range

High Strength Film Reinforcement Wet-Applied Waterproof Membrane


Waterproofing works of basement, roof, municipal engineering, etc.
Construction Method
- Adhesion method: On the dry, flat and dust-free base layer, first brush the base treatment agent. After drying, remove the isolation film from the self-adhesive surface of the coil, and then bond directly with the substrate.- Wet-applied method: Plain cement slurry is evenly applied on the base, which is used for bonding transition between the base and the self-adhesive surface of the coil. After removing the isolation film of the self-adhesive surface of the coil, it is directly bonded with the transition bonding layer. In vertical construction, a certain amount of special glue can be added to the cement slurry to increase the viscosity of the cement slurry.
- Construction process:
Clean up the substrate →moisture the substrate → locate and snapping →plastering cement slurry →pave waterproof membrane →flapping the upper surface of coil and pulping →airing membrane for 24hrs to 48hrs →repair and acceptance.
- Notes:
Do not pave membrane in rainy, snowy or windy weather.
During construction, it is necessary to ensure the cleanliness of surface at the overlap.
When construction at low temperature, hot air should be used to assist the construction of the overlapping part.
Packaging & Shipping
Port:Tianjin Xingang Port
Shipping:Support Sea freight
Send inquiry